![]() |
|
During the Construction Phase, an e-solution is built and tested according to the specifications of the functional specification and the High-Availability Architecture. As with the Interactive Design Phase, this continues to be an interactive process. Clients are continually involved throughout construction, as business models and system designs are refined and updated. The deliverable from this phase is fully-tested software that is ready for user acceptance testing based on the Frame Document.
|
Technology
|
|||||||||||||||||||||||||||||||||||||||||||||||||
|
client extranet | news | catenas network | contact us | sitemap | home Copyright © 2001 Euphorion, Inc. All rights reserved. |
||||||||||||||||||||||||||||||||||||||||||||||||||